Our projects in the Georges River Council area
We're working in these suburbs, click below to find out more
Allawah, Beverley Park, Beverly Hills (part), Blakehurst, Carlton (part), Carss Park, Connells Point, Hurstville, Hurstville Grove, Kingsgrove (part), Kogarah (part), Kogarah Bay, Kyle Bay, Lugarno, Mortdale, Narwee (part), Oatley, Peakhurst, Peakhurst Heights, Penshurst, Ramsgate (part), Riverwood (part), Sans Souci (part) and South Hurstville.
We’re here to help! You can always contact us during normal business hours on Delivering4Customers@sydneywater.com.au or 1800 006 113 and select option 2. If we are unable to answer, or if you are calling outside normal business hours, leave a detailed message and we'll get back to you as soon as possible or the next business day.
We're working in these suburbs, click below to find out more
Allawah, Beverley Park, Beverly Hills (part), Blakehurst, Carlton (part), Carss Park, Connells Point, Hurstville, Hurstville Grove, Kingsgrove (part), Kogarah (part), Kogarah Bay, Kyle Bay, Lugarno, Mortdale, Narwee (part), Oatley, Peakhurst, Peakhurst Heights, Penshurst, Ramsgate (part), Riverwood (part), Sans Souci (part) and South Hurstville.
We’re here to help! You can always contact us during normal business hours on Delivering4Customers@sydneywater.com.au or 1800 006 113 and select option 2. If we are unable to answer, or if you are calling outside normal business hours, leave a detailed message and we'll get back to you as soon as possible or the next business day.
-
Lugarno 2210
Share Lugarno 2210 on Facebook Share Lugarno 2210 on Twitter Share Lugarno 2210 on Linkedin Email Lugarno 2210 linkWet Weather Overflow Abatement Program (smoke testing)
Wastewater Fix is an important program to reduce stormwater entering our wastewater system. As part of Wastewater Fix, we’ll be smoke testing over 7,000 properties in your suburb to inspect the local stormwater and wastewater system.
Work involves
Our crews will move from property to property in your suburb and complete a short 30-minute inspection of the pipes and drains around your house. It will include non-toxic smoke testing and taking photographs and videos of your pipes.
If there is more work to be done at your property, you'll be notified.
Start: Late-August 2023 to early-2024.
-
Peakhurst 2210
Share Peakhurst 2210 on Facebook Share Peakhurst 2210 on Twitter Share Peakhurst 2210 on Linkedin Email Peakhurst 2210 linkWet Weather Overflow Abatement Program (smoke testing)
Wastewater Fix is an important program to reduce stormwater entering our wastewater system. As part of Wastewater Fix, we’ll be smoke testing over 7,000 properties in your suburb to inspect the local stormwater and wastewater system.
Work involves
Our crews will move from property to property in your suburb and complete a short 30-minute inspection of the pipes and drains around your house. It will include non-toxic smoke testing and taking photographs and videos of your pipes.
If there is more work to be done at your property, you'll be notified.
Start: Late-August 2023 to early-2024.
-
Mortdale 2223
Share Mortdale 2223 on Facebook Share Mortdale 2223 on Twitter Share Mortdale 2223 on Linkedin Email Mortdale 2223 linkWet Weather Overflow Abatement Program (smoke testing)
Wastewater Fix is an important program to reduce stormwater entering our wastewater system. As part of Wastewater Fix, we’ll be smoke testing over 7,000 properties in your suburb to inspect the local stormwater and wastewater system.
Work involves
Our crews will move from property to property in your suburb and complete a short 30-minute inspection of the pipes and drains around your house. It will include non-toxic smoke testing and taking photographs and videos of your pipes.
If there is more work to be done at your property, you'll be notified.
Start: Late-August 2023 to early-2024.
-
Oatley 2223
Share Oatley 2223 on Facebook Share Oatley 2223 on Twitter Share Oatley 2223 on Linkedin Email Oatley 2223 linkWet Weather Overflow Abatement Program (smoke testing)
Wastewater Fix is an important program to reduce stormwater entering our wastewater system. As part of Wastewater Fix, we’ll be smoke testing over 7,000 properties in your suburb to inspect the local stormwater and wastewater system.
Work involves
Our crews will move from property to property in your suburb and complete a short 30-minute inspection of the pipes and drains around your house. It will include non-toxic smoke testing and taking photographs and videos of your pipes.
If there is more work to be done at your property, you'll be notified.
Start: Late-August 2023 to early-2024.
-
Beverley Park
Share Beverley Park on Facebook Share Beverley Park on Twitter Share Beverley Park on Linkedin Email Beverley Park linkWastewater Upgrade for the Kogarah Road Submain
Wyuna Street, Lacey Street, Stubbs Street, Beverley Park
UPDATE: We're taking a two-week break over the summer holidays. We return to work on Monday 8 January, 2024. We have a few more things to finish before we start restoration and demobilise off site. You'll be notified with more detail in the new year.
Sydney Water will be completing repairs on the wastewater network and some maintenance holes in Kogarah and Beverley Park.
We completed investigation work in November 2022 and we are now ready to start construction. This work will make sure the hundred-year-old wastewater pipe will continue to work for many years into the future.
In Beverley Park, we’ll be repairing approximately 270 metres of wastewater pipe and eight maintenance holes.
We’ll carry out inspections on the wastewater network and maintenance holes before we start construction work.
Our construction work will include:
cleaning out and relining 270 metres of the underground wastewater system
installing and replacing two maintenance holes.
Assets (maintenance holes) located within private properties will need to be accessed during this work. These residents will be contacted directly to arrange safe access for the work and restoration once we have completed the relining activities.
Project timing: October 2023 to December 2023
Click here to read the community notification
Community contact: 1800 006 113 (option 2) If you call outside of work hours, please leave a return phone number.
South Region Delivery Team
The South Region Delivery Team are working to deliver projects in the Georges River LGA.
Who we are
Established in 2020, the South Region Delivery Team is a partnership of Sydney Water and Delivering 4 Customers (D4C), a joint venture with John Holland, Service Stream and WSP.
Click on the logo to find out more about D4C
Who can I talk to?
-
Phone 1800 006 113 (option 5) Email Delivering4customers@sydneywater.com.au -
Phone 1800 006 113 (option 2) Email Delivering4customer@sydneywater.com.au
Faults, leaks or overflows
To report faults, leaks or overflows, call 13 20 90 (24 hours) or click here.