St Lukes Park

Sydney Water is investigating the stormwater canal in St Lukes Park, Concord as it is in need of repair. This work will help maintain the stormwater system and protect the local environment.

We are looking at opportunities for the stormwater canal like naturalisation which involves replacing the concrete walls with natural looking banks made of rocks and native plants. This method has been used in waterways across Sydney to improve their health and character.

Sydney Water is investigating the stormwater canal in St Lukes Park, Concord as it is in need of repair. This work will help maintain the stormwater system and protect the local environment.

We are looking at opportunities for the stormwater canal like naturalisation which involves replacing the concrete walls with natural looking banks made of rocks and native plants. This method has been used in waterways across Sydney to improve their health and character.

  • Final concept design

    almost 2 years ago
    St lukes

    We have finalised the concept design based on your feedback. The final concept design can be viewed here. A summary of consultation is available here. Thank you to everyone who gave feedback. Our next step will be to do more detailed investigations to make sure everything proposed is feasible. We will let you know if anything changes during the next stage of design.


    We have finalised the concept design based on your feedback. The final concept design can be viewed here. A summary of consultation is available here. Thank you to everyone who gave feedback. Our next step will be to do more detailed investigations to make sure everything proposed is feasible. We will let you know if anything changes during the next stage of design.


  • Thank you for attending the drop in information session

    by Emily, over 2 years ago

    We'd like to thank everyone that came to the drop in information session on Saturday 19 November and those who took the time to fill out the survey.

    We will provide a summary and an update on the project in early 2017.

    In the meantime, you can continue to contact us via the forum, phone (1800 257 484) or at waterways@sydneywater.com.au.

    Please note that the forum, phone and email will not be monitored from Friday 23 December 2016 until we return to the office on Monday 9 January 2017.


    We'd like to thank everyone that came to the drop in information session on Saturday 19 November and those who took the time to fill out the survey.

    We will provide a summary and an update on the project in early 2017.

    In the meantime, you can continue to contact us via the forum, phone (1800 257 484) or at waterways@sydneywater.com.au.

    Please note that the forum, phone and email will not be monitored from Friday 23 December 2016 until we return to the office on Monday 9 January 2017.


  • View the early concept designs

    by Emily, over 2 years ago
    St lukes early concept designs
    You can now view the early concept designs.

    To tell us what you think, fill out our survey or visit the discussion board.

    Following the completion of consultation we will prepare a report detailing the feedback we received from the community survey and on the concept designs.



    You can now view the early concept designs.

    To tell us what you think, fill out our survey or visit the discussion board.

    Following the completion of consultation we will prepare a report detailing the feedback we received from the community survey and on the concept designs.



  • Community drop in session

    over 2 years ago
    Info session example

    See the early concept designs and tell us what you think, drop by on Saturday 19 November 2016. You'll be able to provide your feedback and ask questions of the project team.

    Date: Saturday 19 November 2016

    Time: 9 am to 11 am

    Location: St Lukes Park, next to the car park off Crane Street, Concord

    We'll upload the early concept design to Sydney Water Talk on the same day as the drop in session for those that can't make it on the day.


    See the early concept designs and tell us what you think, drop by on Saturday 19 November 2016. You'll be able to provide your feedback and ask questions of the project team.

    Date: Saturday 19 November 2016

    Time: 9 am to 11 am

    Location: St Lukes Park, next to the car park off Crane Street, Concord

    We'll upload the early concept design to Sydney Water Talk on the same day as the drop in session for those that can't make it on the day.